Green Bay Farms, Iowa Solar Project + Green Hydrogen + Green Ammonia
mid development stage / in progress / RFP for PPA with local utility submitted
1,100 acres with 207 MW DC PV solar/207MW BESS /1,650 MWh/MW
Green Bay H2 + NH3, Iowa / Land Control & onsite Water Rights existing wells
mid development stage / in progress / feed-in confirmed / new NH3 pipeline connection is onsite
3,000 MW DC PV solar to DC (Buffer) storage to 500 MW DC H2 electrolyzer (Higher Efficiency)
for onsite NH3 pipeline feed-in with a capacity of up to 1.1 million metric tons certified Green NH3 p.a.
Green Liberty Farms, Missouri Solar Project + Green Hydrogen + Green Ammonia
early stage development / in progress / existing 161kV & 345 kV infrastructure onsite
500 MW+ DC PV solar/ 500 MW+ BESS / 100MW Hydrogen
Green Liberty H2 + NH3, Missouri Solar Project to Green Hydrogen + Green Ammonia
mid development stage / in progress / feed-in confirmed / existing NH3 pipeline connection is onsite
6,000 MW+ DC PV solar + BESS (DC buffer) storage + 1,000MW H2 electrolyzer to Green NH3.
Sun Mesa, Arizona
mid development stage / in progress
3,200 Acres / 850 MW PV + 850 MW BESS
prod 2,503 MWh/MW 1-axis tracker IX / APS queue at dual 345kV
Sun Valley, Arizona
early stage development / in progress
400 Acres / 100 MW PV + 100 MW BESS
prod 2,503 MWh/MW with 1-axis tracker
Sun Industry, Arizona
mid development stage / in progress
220 acres
30.0 MW PV + 15 MW BESS
Est.prod. 2,503 MWh/MW 1-axis tracker
IX in APS queue 69 kV/sub