Green Bay Farms, Iowa Solar + BESS Project for Data Centers
mid development stage / in progress / onsite PPA ´s for Data Centers on
2,500 acres for up to 500 MW constant power supply - BESS + RNG-H2-NH3 backup power solutions. These sites have access to geothermal hydro cooling for efficiency increase and cooling cost reductions.
Green Bay H2 + NH3, Iowa / Land Control & onsite Water Rights existing wells
mid development stage / in progress / feed-in confirmed / new NH3 pipeline connection is onsite
up to 3,000 MW DC PV solar to DC (Buffer) storage to 500 MW DC H2 electrolyzer (Higher Efficiency)
for onsite NH3 pipeline feed-in with a capacity of up to 1.1 million metric tons certified Green NH3 and e-Methanol production onsite from biogenic CO2 with transportation ways to the Port of New Orleans RFNBO & CBAM compliant
Green Liberty Farms, Missouri Solar Project + Green Hydrogen + Green Ammonia
early stage development / in progress / existing 161kV & 345 kV infrastructure onsite
600 MW+ DC PV solar/ 600 MW+ BESS + backup power / 200MW Hydrogen on more than 2,500 acres for up to 500 MW constant power supply - BESS + RNG-H2-NH3 backup power solutions.
These sites have access to geothermal hydro cooling for efficiency increase and cooling cost reductions.
Green Liberty H2 + NH3, Missouri Solar Project to Green Hydrogen + Green Ammonia
mid development stage / in progress / feed-in confirmed / existing NH3 pipeline connection is onsite
up to 6,000 MW DC PV solar + BESS (DC buffer) storage + 1,000MW H2 electrolyzer to Green Ammonia and e-Methanol from biogenic CO2 with existing transportation ways (pipeline & landing docks) to the Port of New Orleans as RFNBO & CBAM compliant Fuels for international distributions.
Sun Mesa, Arizona
mid development stage / in progress
4,600+ Acres / 1,500 MW PV + 1,500 MW BESS as LDES (12-hour duration) with FCAS/DR ancillary services for Utilities at onsite POI with 345kV (double-circuit) and onsite BTM power supply for co-locating hyper-scale Data Centers & Bitcoin with LDES storage and additional backup power solutions.
Sun Valley, Arizona
development in progress for Data Centers & BitCoin Mining / Fiber Optic Line is Onsite
2,300+ Acres / access to 1,000 MW PV + onsite BESS (69.0 kV / 500kV behind-the-meter / micro-grid) in 2026 / Fiber Optic Line (Dallas - Las Vegas) is directly onsite for hyper-scale Data Centers & Bitcoin.
Sun Industry, Arizona
development in progress for Data Centers & BitCoin Mining / Onsite Water Electrolysis for Green Hydrogen
230+ Acres / access to 1,000 MW PV + onsite BESS (69.0 kV / 500 kV behind-the-meter / micro-grid)
onsite water access for cooling & Green Hydrogen Production for Ammonia & e-Fuels with a direct Interstate Highway exit onsite (1,000 feet), dark fiber optic eX2 access and Natural Gas pipeline
for up to 200MW with CCUS of Natural Gas power generation capacity at the property.
Always looking ahead, we bring the latest and most innovative technologies to market,
such as cutting-edge AgriVoltaic solutions through SunStall.com and SunZaun.com,
featuring vertical solar solutions.solutions. (Picture source SunStall.com)
Dual land use and beneficial effects with AgriVoltaic solutions through
SunZaun.com, (translation: sun fence) featuring vertical solar integrations for farmers.
(Picture Source: SunZaun.com)
Copyright © 2025 GoSolar, LLC - All Rights Reserved.
Powered by the sun